St Barbara Limited completed on schedule the laying of the deep sea tailings placement pipeline over the past weekend. Wet commissioning of the process plant at Simberi Operations was conducted in preparation for the on-schedule commencement of full processing over the coming week. Simberi remains on track to meet its FY22 guidance with production of between 60,000 and 70,000 ounces, with the first gold pour expected this month. While the mill has been shut down, Simberi has established a 130kt oxide ore stockpile on ROM pads and implemented multiple processing plant upgrades. These upgrades include the replacement of cyanide mixing and storage tanks, refurbishment of the rope conveyor, installation of downcomers in the carbon in leach (“CIL” circuit to promote slurry mixing, a new lime circuit and several process control enhancements to CIL and thickener circuits. A new mine plan has been developed to deliver oxide material to the mill, with substantial pre stripping work conducted over the last 6 months.
- Forums
- ASX - By Stock
- BDC
- Ann: St Barbara to acquire Bardoc Gold via scheme of arrangement
Ann: St Barbara to acquire Bardoc Gold via scheme of arrangement, page-83
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BDC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online