CWE 0.00% 4.2¢ carnegie wave energy limited

ceto emigrating, page-15

  1. 1,592 Posts.
    lightbulb Created with Sketch. 12

    This is the latest from Reunion Island. Why wouldn't you follow this govt's support, and EDF's clout, even if your cut of the final project is much less.

    After all, rather than massively diluting CWE shareholders with a 5MW project off Garden Island, they'd get a project fee, a licence fee, income from their work and expertise on the project right from the start and have EDF's support and no doubt some further generous support from the French govt (though i'm not in the habit of expecting that anymore!)

    It's a google translation so a bit dodgy.


    October 23, 2009 Eight million for marine energy

    Eight million euros will be invested in the recovery plan to fund research and development of two marine energy projects. The State, County and businesses have signed to Reunion lab watched by the world.

    This is to liberate the island of fossil fuels by 2030 for Paul Verges, president of the Region, "We arrive to meet the challenge of energy independence in collaboration with the State and the President of the Republic. Today begins a trial period on the reality of marine energy. And these works have an international reach. "W'e're like the discoverers."

    Two marine technologies still being developed: The first is simply the ocean thermal energy (ETM) which, via the temperature differential between water depths and the surface, to produce electricity. The project is supported by DCNS first European shipbuilder. The other technology is the CETO project, based on wave energy. EDF Energies Nouvelles (EDF EN) and DCNS will work in unison. The industrial policy (the region with its Prerure), state (with Gerri) and funding is now in place to make the meeting a laboratory in this field worldwide. François Fillon, the Prime Minister had promised in July, 8 million for both projects. Reeve on Monday signed an undertaking by the State or 3 million euros for CETO and 5 million for the ETM.

    The Region, co-owner in these cases, and industry will complement the envelope of this phase of research. The meeting will be the first site to experiment with the CETO technology to actual size. It is a world exclusive that opens the door to a huge potential. Globally, the wave passes all nuclear generation in the world. " Late 2010, the prototype should be validated and launched. The production of electricity itself is scheduled for 2012.



 
watchlist Created with Sketch. Add CWE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.