RE: EBITDA…Final scoping study needs to demonstrate / confirm this project has enough ore to mine for a ~20 year span. (Which I think, if I remember correctly, during Turvey’s tenure, had a study done that calculated that length of time + amount of ore in ground.)
RE: half capex…Would be determined by cost-saving design of facility buildout, method(s) of mining operation(s) & refinement, method of transportation of ore; ore can be transported and paid for by third parties and/or ore buyers. And design of energy generation and output (towards reusable means). Board could also negotiate beneficial tax incentives with Kogi State government.
Board could also work out a deal with a big time company (Vale for ex.) for a ‘first-in-line’ opportunity to buyout Kogi…for a startup funding package to help Kogi with start up operations.
…all depends on final scoping study, and salesmanship.
- Forums
- ASX - By Stock
- M4M
- Is everyone ready for the pump n dump?
Is everyone ready for the pump n dump?, page-140
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add M4M (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.005(23.8%) |
Mkt cap ! $94.20M |
Open | High | Low | Value | Volume |
2.2¢ | 2.6¢ | 2.2¢ | $340.8K | 14.22M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 900000 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 162409 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 900000 | 0.025 |
4 | 850000 | 0.024 |
5 | 1119564 | 0.023 |
5 | 972725 | 0.022 |
8 | 935100 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 162409 | 1 |
0.027 | 800000 | 6 |
0.028 | 614615 | 5 |
0.029 | 540609 | 2 |
0.030 | 2059956 | 5 |
Last trade - 16.10pm 02/10/2024 (20 minute delay) ? |
Featured News
M4M (ASX) Chart |