E25 5.71% 33.0¢ element 25 limited

Ann: Scoping Study - HPMSM Conversion Plant Economics, page-6

  1. 2,960 Posts.
    lightbulb Created with Sketch. 6506
    So looking at the 50ktpa train,

    On a quick check below, you get within rounding of the numbers given. 78.4kt of ore becomes 66.6kt of MSM across two different grades. MSM as per above is also a mid-30% product so the 85% recovery factor probably reflects both loss and concentration factors. Taking the numbers quoted and multiplying them out gives $74.3m of margin and the quoted figure was $73m. This is within the range of rounding.

    https://hotcopper.com.au/data/attachments/3993/3993477-2cdd30333fb1cb23c535e3265f46901c.jpg
    If this 78.4kt of ore was shipped at the Dec 2020 price estimate of US$4.39/t it would have generated about US$11m in revenue. If put through the planned process, this increases to US$112m of revenue. It will be interesting to see the markets reaction today.

    From the link below the mass composition of MnSo4 is :Mn 36.38%; O 42.38%; S 21.24%
    https://foodb.ca/compounds/FDB015369
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
33.0¢
Change
-0.020(5.71%)
Mkt cap ! $72.57M
Open High Low Value Volume
35.5¢ 35.5¢ 32.0¢ $377.0K 1.118M

Buyers (Bids)

No. Vol. Price($)
1 1500 32.5¢
 

Sellers (Offers)

Price($) Vol. No.
33.0¢ 15734 1
View Market Depth
Last trade - 16.10pm 27/09/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.