HIGHLIGHTSâ–Ş Drilling Rig and Technical crew mobilising to site this weekâ–Ş Reverse Circulation (RC) drilling programme has been expanded from 5,000m to 10,000mâ–Ş Multiple drill campaigns planned until May, targeting Main Zone, Pioneer, Western Lode, NewSouthern Zone and Clone which have the potential to host significant shallow, high gradegold mineralisationâ–Ş Diamond Drilling to commence post initial RC drilling campaign of ~2,500m to aid theplanning and targeting of deeper mineralisation down plunge of identified high-grade goldmineralisationâ–Ş Previous drilling completed in November 2021 at New Bendigo returned significant goldmineralisation, including:o 8m at 40.5 g/t Au from 70m, including 3m at 105.34 g/t Auo 16m at 13.89 g/t Au from 1m, including 3m at 69.20 g/t Auo 7m at 2.89 g/t Au from 56m, including 1m at 15.45 g/t Auo 6m at 1.93 g/t Au from 12m, including 2m at 4.29 g/t Auo 3m at 4.67 g/t Au from 126m, including 2m at 6.74 g/t Au
#My plan.. accumulate.. wait.. make bags of money
- Forums
- ASX - By Stock
- MHC
- Ann: Drilling to recommence at the Tibooburra Gold Project
Ann: Drilling to recommence at the Tibooburra Gold Project, page-2
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MHC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.937M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MHC (ASX) Chart |
Day chart unavailable