Nammuldi:
there wasn't any gascap in the offset wells B3, B5 next doors on the other side of the attic. The Buffalo Gas Oil Ratio was low, ie 120 scf/bbl and associated gas was flared, used as fuel & reinjected to provide gas lift for the production wells till Nov2004. Less then 2.9PJ gas was produced for the activities listed above along with 20mmbbls of oil & 33mmbbls of water on the FPSO.
Post shutdown, they haven't shot any new 3Dseis, so the FWI Analysis used past production data from the 4 wells (B3, 5, 7, 9) & existing geophysical data for the modelling, incorporating all the known variables from that time. Hope this helps.
- Forums
- ASX - By Stock
- CVN
- Ann: Trading Halt
Ann: Trading Halt, page-62
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $304.1M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.0¢ | $435.9K | 2.621M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 248625 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 335988 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 248625 | 0.165 |
5 | 108508 | 0.160 |
14 | 536050 | 0.155 |
14 | 972770 | 0.150 |
17 | 745185 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 235988 | 2 |
0.175 | 1137347 | 8 |
0.180 | 501225 | 8 |
0.185 | 882813 | 5 |
0.190 | 716500 | 3 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online