Its all ready to hook up when they hit the payzone TC....
"The prospect is close to pipeline and oil transportation networks.
Site conditions are ideal and access to
the site is from a main road There is also A gas fired power station that sits on same road less than 5k
first proposed well."
- Forums
- ASX - By Stock
- FUT
- 1.2 tcfe target. shell oil failed big time
1.2 tcfe target. shell oil failed big time, page-7
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)