It seems a lot of people have a short memory when i come to the recent diamond drill program.
To qoute marmota
Objectives of Diamond Drilling Program
The diamond program [ see ASX:MEU 6 July 2021 ] is primarily a production-focused program, designed to
provide the necessary detail to advance Aurora Tank to production, including:
1. Geotechnical: design of optimal pit walls at Aurora Tank
2. Bulk Density measurements:
Required for completing (a) resource estimation and (b) scoping/feasibility studies
3. Bulk samples to enable final phase metallurgical testing across:
a) different weathering zones (from strongly weathered oxide zones to deeper fresh rock) and
b) different areas of the deposit, including the first diamond drilling in the high-grade NW flank
This wasnt an exploration focused rc drilling program, and a lot of work would need to be done with the core before cutting and crushing for assay.
- Forums
- ASX - By Stock
- MEU
- Open Letter to Dr Colin Rose
Open Letter to Dr Colin Rose, page-15
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEU (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
-0.002(5.26%) |
Mkt cap ! $39.11M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.6¢ | $3.744K | 104.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 173775 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 557871 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 173775 | 0.036 |
6 | 589346 | 0.035 |
4 | 644117 | 0.034 |
2 | 175000 | 0.033 |
3 | 78960 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 557871 | 3 |
0.039 | 329982 | 2 |
0.040 | 262759 | 4 |
0.041 | 63562 | 2 |
0.043 | 257142 | 1 |
Last trade - 13.43pm 02/10/2024 (20 minute delay) ? |
Featured News
MEU (ASX) Chart |