re: Ann: Boardroom Radio Interview with Manag... Geological model confirmed with 10km spacings between 4 holes - plenty of geological information regarding target depths. EM looks like its going to used in the future. High priority drill targets looks likely into 2010. Phase 3 looks like it is aiming step outs from UC19 to be finished before Christmas.
- Forums
- ASX - By Stock
- BOM
- Ann: Boardroom Radio Interview with Managing Dire
Ann: Boardroom Radio Interview with Managing Dire, page-2
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)