AEV 10.0% 1.1¢ avenira limited

transport logistics study

  1. 9 Posts.
    Appendix 12B to the Environmental Impact study is the export transport logistics study.
    w ww.minemakers.com.au/downloads/Appendix_12BTransportLogistics.pdf

    Intentionally or not, It appears to contain a lot of information that you might expect to be reserved for a feasability study. The three paragraphs below are straight from the executive summary:

    "The above logistic arrangements translate to an overall transportation cost from the mine to the port shiploader at an estimated $93.31 to $73.80 per tonne for 1 Mtpa and 3 Mpta correspondingly."

    "The associated estimated upfront capital expenditure required is AUD$89.6 million and AUD$115.8 to support 1 Mtpa and 3 Mtpa throughput respectively. A part of the capital investment differential can be progressively made in certain infrastructure (e.g., accommodation) components as the operations grow towards the ultimate task of 3 Mtpa"

    "The annual transportation cost from the mine to the Port only is estimated to be $74.3 to $64.49 per tonne for 1 Mtpa and 3 Mpta correspondingly. The anaylised capital expenditure portion is within the range of 14 % to 25 %."

    There's a lot of information there but well worth the read.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $29.74M
Open High Low Value Volume
1.1¢ 1.1¢ 1.1¢ $14.12K 1.311M

Buyers (Bids)

No. Vol. Price($)
3 2012302 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 996420 4
View Market Depth
Last trade - 14.30pm 15/11/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.