The wording is very positive....
"Additionally, the 6 inch gas sales pipeline for the Frances Dilworth No. 2H has been laid out, welded,
trenched and buried. This will allow the pending flow-back of the well to take place in the sales line and
for revenue to immediately begin at the conclusion of fracture stimulation operations."