CVN 0.00% 16.5¢ carnarvon energy limited

Ann: Pavo-1 Drilling Update, page-11

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 84 Posts.
    lightbulb Created with Sketch. 39
    That will be very smart choice to drill the well deeper before wireline. As the well had been secured during cyclone evacuation and down-manned, it was about a week right, to avoid wireline tools to be stucked during logging - as well as cleaning cutting /solid deposit at the bottom hole which cause the tool can’t reach to bottom - and the Mud have to be conditioned so that it won’t effect to wireline signal, they have to run in hole the BHA for wiper trip and conditioning the mud before run wireline logging. To save time and money they are better run in hole with BHA and drilling the well deeper, 500m may take extra 1 or 2 days of drilling, 1 job 2 target, perfect, save time and money and discover another target, Milne is also the oil target in dorado field if I am not wrong.
    just sharing idea, not an advice, glat…
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
16.5¢
Change
0.000(0.00%)
Mkt cap ! $295.1M
Open High Low Value Volume
16.5¢ 17.0¢ 16.0¢ $636.5K 3.866M

Buyers (Bids)

No. Vol. Price($)
8 624083 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 745415 12
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.