Until we have conformation that the Gekko is on site
and assembled ready to process the ore, we have
nothing but a hole in the ground.
Todays ann is not news apart from the fact that we have a hole,
this information was and is available from previous drill announcements
including grades.
There has been no mention of the Gekko by the company
since the time that the company was informed by DMIRS
that the company could not re-assemble the Gekko
until a Mining Permit was issued. "The MP has now been issued".
What SHs need to know is, is the Gekko plant on site.
if not when will the plant be on site.
How long before the plant is in operation ready for processing.
Is the current sample going to be processed by this plant,
if not, who and when is going to do the processing.
If these questions are not answered than IMO, this is
starting to look like a first class con job.
- Forums
- ASX - By Stock
- CLZ
- Ann: Kat Gap Gold Surfaces
Ann: Kat Gap Gold Surfaces, page-35
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.544M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CLZ (ASX) Chart |
Day chart unavailable