Last Ann 10 days ago stated Flow testing will commence late march, start of next week is late March.
*****The Anshof wellsite has provision for up to 3 drilling slots, the Anshof-3 surface location was approved first by
all necessary authorities to allow spudding. Anshof is fully covered by modern 3D seismic and is on trend
existing producing oilfields in the NW (Voitsdorf, Bad Hall and Pfarrkirchen) and in the NE (Sierning) as shown
in Figure 2.
The other drilling slots will be used for near term appraisal and development drilling. The objective of the next
wells will be to maximize well productivity by targeting areas of thicker Eocene reservoir development as shown
in Figure 3.******
Yall Need Patience IMO
Cheers
- Forums
- ASX - By Stock
- XST
- Ann: Borba Test Results Confirm Excellent Production Potential
Ann: Borba Test Results Confirm Excellent Production Potential, page-76
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XST (ASX) Chart |
Day chart unavailable