NWE 0.00% 5.6¢ norwest energy nl

Ann: Testing and Seismic Operations Update, page-57

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Its not connected to Waitsia if that's what u r looking for JC.

    Bit deeper due to the tectono-stratigraphy of the area. Waitsia is on a Terrace, west of which lies Dandaragan trough. LD-1 lies in the Northern part of this trough. So its practically impossible to establish Kingia connectivity from Waitsia to LD or Nth Erreg as there is a downthrow from the regional fault. This unique deeper deposition is revealing that the sediments didn't get squeezed hard enough (diagenesis et al in play). So the Permeability & Porosity was preserved at 4000+ metres depth & alongwith the Kerogen (i.e, organic matter) this got cooked up at certain temp/press setting in the Gas Kitchen. Hence the reason for the spate of discoveries at 4000+ depth.

    Shallowest well Senecio-3 tested the Kingia at 3173-3183m.
    Deepest well at W4 flowed from 3370-3420m.
    LD1 tested at 4041-4066m,
    WE-2 from 4799-4951m.

    That paints a rough picture as to what's going on from the terrace to the trough. So forgot about connectivity, its not possible Tectonically. Its a separate province albeit deeper & deserves its own merits.

    I think u should start with EGO presentation from Feb 2016 when they had 80% of this block & Waitsia flowtest were unlocked. MIN picked up EGO when they went into admin on Nov2017.

    It's taken 3 to 5 more years since 2016, to discover West Err-2 in 2019 & LD-1 in 2021 to prove this theory of movable gas with low CO2 content in the Deeper part of D/Trough.

    Back in 2016 EGO had a smaller area assigned to LD-1 & NE-1 for a much less low-best-high estimate. I think LD-1 unlocked the Kingia, so more wells spread out over the acreage are reqd to derisk the potential. That will take some time as the Operator MIN needs to fast-track the Exploration/appraisal program, buy long lead items, line up a rig, EARS approval etc etc. From discovery to development & then to First gas takes a few years, which is why the pullback with the SP as the mkt awaits the next round of drilling & funding etc. Routine 'Rinse & Repeat cycle' on the ASX for all Junior Explorers.
 
watchlist Created with Sketch. Add NWE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.