KP2 0.00% 6.1¢ kore potash plc

Exciting Times For KP2, page-96

  1. 360 Posts.
    lightbulb Created with Sketch. 42
    The Company expects to receive the following from the Consortium by the end of Q1 2022
    - The completed Optimisation Study Report.
    - An Engineering, Procurement and Construction (“EPC” contract proposal for the
    construction of Kola consistent with the 2017 2nd edition FIDIC Silver book.

    As per their last quarterly
 
watchlist Created with Sketch. Add KP2 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.