MAY 4.35% 2.2¢ melbana energy limited

Ann: Alameda-1 Significant oil pay defined in Marti structure, page-189

  1. 3,578 Posts.
    lightbulb Created with Sketch. 1855
    Feral54,

    It’s the well design and the interpretation of the seismic, the upper sheet was a shit load bigger then expected. Hence many things occurred whilst drilling it that prevented it being able to be flow tested.

    The deeper primary targets were always going to be priority for testing. We have plenty to look forward too as these structures are large.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.