Interveiw out not long ago.
- At depth is where the high grade/width is as i pointed out before at Menzies. Sounds like the very first deep holes were spot on the money. Not much is drilled below 200m. Let's go deeper i say!
- Ist DD hole completed at Sir Laurence and it went down to 400m! How deep is this system.