TER 2.56% 19.0¢ terracom limited

Ann: Quarterly Report - January to March 2022, page-63

  1. 90 Posts.
    lightbulb Created with Sketch. 14
    WW is UG and technically challenging due to the deep weathering profile that causes geotechnical issues and a large reduction in reserves. There is also a gas pipeline and other mining infrastructure owned by the majors at surface that will eliminate any OC opportunities unlocked by the current high product prices. It will be very difficult and costly to bring into production. Need lots of further drilling - Carabella's exploration was aimed at dressing up the project for sale rather than mine development.

    The MCM project is similar to the coal deposits in Mozambique - you are looking at a 20-30% practical SHCC yield and a overall 50% saleable coal yield. The railway has capacity limitations and the domestic thermal market (Eskom) for the secondary thermal product is more than 500km away. Why do you think Rio sold the Moz assets at a massive loss?
 
watchlist Created with Sketch. Add TER (ASX) to my watchlist
(20min delay)
Last
19.0¢
Change
-0.005(2.56%)
Mkt cap ! $152.1M
Open High Low Value Volume
20.0¢ 20.3¢ 18.5¢ $409.3K 2.130M

Buyers (Bids)

No. Vol. Price($)
1 29998 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 25385 2
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
TER (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.