CRB 0.00% 0.4¢ carbine resources limited

Ann: Carbine to acquire the Sandbox Silica Sands Project, page-53

  1. 102 Posts.
    lightbulb Created with Sketch. 17
    Hey No plebs I’m thinking what your thinking on this .. Muppet show.. At least I think it explains the suppressed share price keeping it below 3c

    If I can share any thoughts or Info I’m all for the discussions to help us all try understand what goes through there heads (Bar Greed, control and a habit of Stuffing Good projects..

    The time frame of bringing this project on of 9 months “fast track” bullshit … !! WONT HAPPEN .. look what they announced today and the Next steps !!! Haaaaaa

    Drilling , Environmental, Drilling , resource calculations and a MINING LEASE APPLICATION.. Last ?? WHAT ! NOT ONE MENTION OF A PLANT .. They need a plant to get the beach sand to a product bar FILL … Where’s the shape of the Silica Sand (very Important) to the Glass manufactures and melting process as it doesn’t melt consistently .. Where’s the Mesh size of the Grains of sand ? (Imperative) if you havernt got the correct size grains and have 85-90% of them within a set parameter… Your losing 20,30,50% of each tonne you dig up.. WONT WORK you can have 99.9% pure but wrong shape and too big or small won’t work …

    Those big glass manufacturers when doing off takes buying Silica need to have a constant supply of the SAME Silica Size, Grade , Shape

    They will not have this going within 18months .. if they do get it going ..

    I can’t emphasise how good and rare the Muchea results are It are when the resource gets defined…. It will be The Largest High Grade Silica Sand Deposit in the World …

    So Why are they doing it?????? Thoughts
 
watchlist Created with Sketch. Add CRB (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $2.207M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $1.236K 309K

Buyers (Bids)

No. Vol. Price($)
4 3256498 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 913228 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CRB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.