As per the notes.
The Pr to Pe was formally completed and uploaded onto the Drc mine system in December 2021.
- Forums
- ASX - By Stock
- AVZ
- AVZ research report
AVZ research report, page-74
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)