SOR 0.00% 4.3¢ strategic elements limited

Ann: SOR Breakthrough in Generating Electricity from Moisture, page-104

  1. 11,086 Posts.
    lightbulb Created with Sketch. 1846
    The annual commitments seem to mostly be a spending requirement with no conditions on specifically what the funds are spent on.

    With Leviathan not being drilled last year it meant that they forfeited the grant for that round however they still met their annual spending requirement for the year ended 2/3/2022 of $118k. The spending requirement remains at that same level this, the second year of the Leviathan permit.

    From what I've observed the spending requirement stays at the same level for the first three years then is bumped up for the last two years, the increased amount is around 50% higher.

    The tenement information requires you to have an account.

    The grant from the government is publicly available at: http://www.dmp.wa.gov.au/Geological-Survey/EIS-Government-co-funded-1433.aspx

    The drilling period for the next round, Round 26, starts from 1/12/2022 to 30/11/2023, so is within the expenditure window for Leviathan for the current year commitments.

 
watchlist Created with Sketch. Add SOR (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
0.000(0.00%)
Mkt cap ! $20.15M
Open High Low Value Volume
4.3¢ 4.4¢ 4.3¢ $4.031K 93.38K

Buyers (Bids)

No. Vol. Price($)
3 224883 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 157975 2
View Market Depth
Last trade - 15.33pm 16/08/2024 (20 minute delay) ?
SOR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.