MAY 3.13% 3.3¢ melbana energy limited

Ann: Drilling of Zapato-1 exploration well commenced, page-56

  1. 1,910 Posts.
    lightbulb Created with Sketch. 210
    If we get billions of barrels in both Marti and alameda, production plans that include production in late 2022, and
    flow test zapato with some luck, producing from it in September, all this to be announced in June and or July, one word , massive
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.