JPR jupiter energy limited

weekly drilling update on j-50 exploration wel

  1. 3,668 Posts.
    lightbulb Created with Sketch. 98
    8 January 2010
    Weekly Drilling Update on J-50 Exploration Well (SV Akkar)
    The Board of Jupiter Energy Limited (ASX: JPR) is pleased to provide the first of its
    weekly update reports on the drilling of the J-50 Exploration Well (referred to in
    previous announcements as SV Akkar).
    J-50 reaches 409m prior to drilling ahead and setting intermediate casing
    before drilling on to the primary Middle Triassic target at ~2800m.
    1. Well Name / Permit: J-50 (SV Akkar), Block 31, Mangistau, Kazakhstan
    2. Reporting Period: The period to 1200hrs 07 January 2010 (GMT +5)
    3. ASX Release Time and
    Date:
    0700 hrs 08 January 2010
    4. Report No: 1
    5. Spud Date: 2330hrs, 29 December 2009 (GMT +5)
    6. Rig: Astra Star Rig #1 (Turnkey Contract)
    7. Days Since Spud: 8.52
    8. Location of Well: Latitude: 4346'43.8" N
    Longitude: 5150'0.78" E WGS 84
    9. Elevation: G.L. 31m MSL
    R.T. 36.5m MSL
    10. Proposed Depth: 3100 3300 metres
    11. Target(s): Primary: Middle Triassic at approximately 2800m.
    12. Present Depth: At 1200hrs 07 January 2010 (GMT +5), 409m.
    13. Current Geological
    Section:
    Paleocene surface carbonate and siltstone.
    14. Operations since last
    Report:
    Spudded well, drilled 394mm hole to 409m. Ran and
    cemented 324mm casing. Commenced rigging up
    BOPs and surface equipment.
    15. Current Operations: At 1200 hrs 07 January 2010 (GMT +5), rigging up
    surface equipment prior to pressure testing BOP.
    16. Future Operations: Pressure test BOP. Complete surface preparations.
    Make up 295mm BHA and run in hole. Drill out
    cement and commence drilling next hole section.
    17. Well/Prospect
    Description:
    This well tests the primary Middle Triassic objective
    in a structural horst trap immediately on trend with
    the oil producing North Akkar field. This location
    tests a play with an estimated 20 mmbbl
    recoverable mapped within Block 31.
    18. Participants in well: Jupiter Energy Limited 100%
    If shareholders have any questions on this announcement they should direct
    them to JPR Managing Director, David Thorpe, on (08) 9322 8222.
    ENDS
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $38.42M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 52552 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 100000 1
View Market Depth
Last trade - 16.21pm 19/09/2025 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.