HDR hardman resources limited

next target, page-4

  1. 264 Posts.
    lightbulb Created with Sketch. 98
    "The Capitaine-1 exploration well was spudded on 16 September 2004. The tophole section was drilled and 13 3/8 inch casing was run to 2,585 metres depth where the casing became stuck. The casing was cemented at this depth but the operational problems have resulted in this top hole being abandoned and the drilling rig, the West Navigator, moved off location on
    19 September. This section will be redrilled in the near future."
    HDR Release 21/09/04

    If the top hole has been abandoned it's a re-spud
    (btw it's not jammed in the oil biz, it's stuck).
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.