TEX 0.00% 8.0¢ target energy limited

highway 71, page-9

  1. 568 Posts.
    lightbulb Created with Sketch. 5
    lautrec,
    I read the ann. as stating the Drill rig would be removed the week before new year. The site would be readied for the compleation rig to be put in place which was the 1st. week Jan., the compleation takes over a week and in the mean time Holliman's would commence to install surface equipment to connect to production line. I would expect, with no hold ups, that an ann. could come any time now.
 
watchlist Created with Sketch. Add TEX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.