Acidising is to dissolve the lime in the dolomite formation to allow higher production rates. It is very commonly used. They have to recover that fluid and most probably inject nitrogen to lift the drilling fluid and the acid to surface to allow the gas to flow. Be patient.
- Forums
- ASX - By Stock
- GGE
- Ann: Jesse 1A Unloading Fluids for Flow Test
Ann: Jesse 1A Unloading Fluids for Flow Test, page-16
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(20.0%) |
Mkt cap ! $9.801M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $10.8K | 2.699M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 15775478 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 1161842 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 15775478 | 0.003 |
11 | 8450009 | 0.002 |
9 | 10700009 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 1161842 | 1 |
0.005 | 4400061 | 14 |
0.006 | 739292 | 3 |
0.007 | 761000 | 2 |
0.008 | 666760 | 2 |
Last trade - 15.52pm 04/10/2024 (20 minute delay) ? |
Featured News
GGE (ASX) Chart |