It costs $10/t to truck dirt 100km.
GMD material (including low grade stockpiles is 1.6g/t). Assuming 95% recovery = 0.05oz/t or $200/oz. Would obviously be lower if high grade the resource.
Given the Dacian mill should be very efficient per tonne IF kept fed with decent head grade material this math easily allows for a pretty economic solution.
Re SBM can see how this could make sense for both parties. GMD post DCN would be highly cash generative. Would allow the cashflow funding of the future Atlantic mines. Plus suspect would be decent SG&A and operational savings from having two operations right by each other.
- Forums
- ASX - By Stock
- GMD
- Ann: Pause in trading
Ann: Pause in trading, page-18
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GMD (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.20 |
Change
0.050(2.33%) |
Mkt cap ! $2.482B |
Open | High | Low | Value | Volume |
$2.23 | $2.24 | $2.18 | $15.12M | 6.854M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 23029 | $2.19 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.20 | 3208 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9751 | 2.190 |
3 | 18751 | 2.180 |
3 | 29971 | 2.170 |
4 | 17451 | 2.160 |
2 | 14751 | 2.150 |
Price($) | Vol. | No. |
---|---|---|
2.200 | 3000 | 2 |
2.210 | 14751 | 3 |
2.220 | 34306 | 2 |
2.230 | 17751 | 2 |
2.240 | 98517 | 5 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
GMD (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online