Just what the doctor ordered
Highlights:
• 72-hour constant rate testing successfully completed at first Pata Pila pumping
well (PPB-01-21).
‒ Brine sampling confirms high grade resource (Li > 910 mg/L).
‒ Hydraulic testing saw aquifer response showing favourable conditions for
high volume brine production (15 – 20L per second).
• 30-day longer term pumping test started and flowing steadily.
• Porosity test (RBRC) for specific yield on second Pata Pila well core samples
returned positive results (range of 10.1 – 21.0%, mean of 14.1%).
• Pumping tests to be completed on three further wells; a second well at Pata Pila
and two wells at Rana de Sal.
• Testing of first well at Rana de Sal (PBRS-01-21) is imminent.
- Forums
- ASX - By Stock
- GLN
- Ann: Outstanding Initial Well Test Results at HMW Project
Ann: Outstanding Initial Well Test Results at HMW Project, page-2
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
-0.005(2.94%) |
Mkt cap ! $79.38M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.0¢ | $231.1K | 1.400M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
28 | 933010 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 148090 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
28 | 933010 | 0.160 |
8 | 1292822 | 0.155 |
19 | 665083 | 0.150 |
5 | 487200 | 0.145 |
8 | 470200 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 139440 | 8 |
0.170 | 440920 | 9 |
0.175 | 282886 | 4 |
0.180 | 229699 | 5 |
0.185 | 132700 | 3 |
Last trade - 13.09pm 05/07/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |