thanks sentina ,
Looking closely for ppp to do well in areas with good results, although its never a given in the oil business.
Two targets I believe. Wonder if they have the same structure as tui.
As for Kan TanIV 21st january release from AWE/Origin:
Quote:"Origin Energy, on behalf of the T/18P Joint Venture, advises that
as at 06:00 hours EDT on Thursday 21 January 2010 the current
operation at Rockhopper 1/ST 1 is drilling 8 hole at a depth
of 2,106m. So far 136m of the sidetrack has been drilled.
Repairs to the cranes on the Kan Tan IV drilling rig were
completed at 17:30 on 19 January 2010 at which time operations
on the Rockhopper 1/ST 1 well commenced.
The side track is designed to appraise the oil and gas zones
discovered in the Rockhopper 1 well and is being drilled to intersect
the main reservoir sections approximately 1.3km south and down
dip from their penetration in Rockhopper 1. This will allow the
volume of oil and gas discovered in the Rockhopper structure to be
fully evaluated.
It is anticipated that from today the sidetrack will take
approximately 1 week to reach the primary reservoir section and
a further 2 weeks to complete data acquisition and plugging and
abandoning operations. As planned, the sidetrack and the
original Rockhopper 1 well will be plugged and abandoned."
3 weeks approx from 21st january to end of drilling
2-3 weeks to shift and set up. About a month+1/2 Hoki then tui hopefully closer to april.
Thanks for the leg up sentina
daveo
- Forums
- ASX - By Stock
- PPP
- in tatters
in tatters, page-6
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PPP (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online