    It's in the order of 100 kW per pump so, if you need 4 production wells to flow at 50 l/s to in order to get a production flow of 200 l/s and, say, 3 injection wells then you might need 7 x 0.1 = 0.7 MWe for internal use.

    You would also need to allow for pumps to operate the cooling system, and, if you use water-cooling, another pump to bring water from a dam or river. All up, these could represent a significant chunk of a 3.8 MWe power plant, so your actual power for sale might be closer to 3 MWe, though you've paid for a 3.8 MWe plant..

    Of course, these factor into the design of a low-enthalpy project - artesian flow is best (fewer pumps), and water cooling (best ORC efficiency) if there is a river or dam very close.
 
watchlist Created with Sketch. Add GRV (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.000(0.00%)
Mkt cap ! $11.92M
Open High Low Value Volume
2.6¢ 2.6¢ 2.6¢ $590 22.68K

Buyers (Bids)

No. Vol. Price($)
2 127865 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 641665 4
View Market Depth
Last trade - 13.56pm 15/08/2024 (20 minute delay) ?
GRV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.