Completed Operations and Forward Plan
Strike drilled the well to final depth, which was declared at 4,890m MD in the Holmwood Shale.
The secondary objective in the High Cliff Sandstones was found to have insufficient reservoir
development to warrant further testing. Once the well has been conditioned Strike will run a 4-
1/2” liner before cementing in place. The well is then planned to be completed across the Kingia
Sandstones with 4-1/2” tubing to surface in preparation for a production test next month.
WE3 is located at following coordinates: 29° 22’ 40.79” S, 115° 18’ 30.70”
Strike Energy Limited is operator and the holder of a 50% joint venture interest in EP469, and
Warrego Energy (ASX: WGO) a holder of the other 50% joint venture interest.
From the WE-3 drill announcement, so yes August flow test
- Forums
- ASX - By Stock
- STX
- Ann: West Erregulla Update
Ann: West Erregulla Update, page-112
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
-0.010(4.44%) |
Mkt cap ! $616.0M |
Open | High | Low | Value | Volume |
22.5¢ | 22.5¢ | 21.5¢ | $372.0K | 1.704M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 1211103 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 608786 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 1211103 | 0.215 |
28 | 1474150 | 0.210 |
13 | 721434 | 0.205 |
35 | 2047147 | 0.200 |
26 | 916251 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 608786 | 8 |
0.225 | 2933679 | 14 |
0.230 | 3007278 | 23 |
0.235 | 2329619 | 19 |
0.240 | 1615754 | 16 |
Last trade - 16.10pm 07/11/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |