ASM 1.85% 53.0¢ australian strategic materials limited

ASM Chart Thread, page-7496

  1. 902 Posts.
    lightbulb Created with Sketch. 24
    don’t know what u are expecting for the kmp they have already given the update on the march quarterly.

    Phase 1 installation and commissioning has progressed and will continue through Q2 2022, with a planned installed capacity of 2,200tpa. The initial production will be Nd and CuTi metal with production of key magnet alloy expected in the third quarter on the completion of the strip caster commissioning. Phase 1 optimisation and ramp-up is planned over the second half of 2022 and will align with the securing of customer sales contracts. The timing of Phase 2, with an installed capacity of 5200tpa, is anticipated by mid-2023.

    so phase two will not be completed till mid 2023 so it is already factored into this share price
 
watchlist Created with Sketch. Add ASM (ASX) to my watchlist
(20min delay)
Last
53.0¢
Change
-0.010(1.85%)
Mkt cap ! $97.88M
Open High Low Value Volume
55.0¢ 55.0¢ 52.8¢ $26.31K 49.13K

Buyers (Bids)

No. Vol. Price($)
4 1017 53.0¢
 

Sellers (Offers)

Price($) Vol. No.
53.5¢ 1858 7
View Market Depth
Last trade - 11.48am 22/08/2024 (20 minute delay) ?
ASM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.