."The Company has requested GR Engineering Services (GRES) to investigate increasing the throughput of the concentrator to 2.2Mtpa (nameplate) concurrently with 1.1Mtpa process plant and infrastructure study. This will include capex and opex estimates to produce approximately 100ktpa of concentrate to feed into a POX circuit to produce a mixed hydroxide precipitate (MHP)."
And......
" If PBT’s pCAM hub is constructed, it could be of great benefit to Poseidon by maximising margins on concentrates supplied to the refinery as well as potentially being able to treat a “rougher” nickel concentrate from Black Swan produced by blending both serpentinite and talc-carbonate ores. Discussions with PBT to supply concentrate from Black Swan as a base load feed for their proposed Kalgoorlie pCAM refinery project remained ongoing during the quarter."
Are these 2 possible outcomes independent ie the POX/MHP would be a stand alone POS project?
- Forums
- ASX - By Stock
- POS
- Ann: Quarterly Activities Report - June 2022
Ann: Quarterly Activities Report - June 2022, page-3
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.81M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $30.48K | 7.695M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
115 | 91754466 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 37104897 | 52 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
105 | 89303653 | 0.003 |
31 | 56825987 | 0.002 |
15 | 34378697 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 36349539 | 48 |
0.005 | 28640183 | 17 |
0.006 | 9266341 | 11 |
0.007 | 1644708 | 7 |
0.008 | 1800000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |