Cheers Magamao. Yes, the takeover shutdown was a joke of an answer. CFO was average at best at answering questions with honesty. Regarding the train that's being assembled, it sounds to me as if this should be completed and up and running end of the month. So even if the BSNF are 6 months away to reduce the 22 days down to 12, the second train should help out massively in the intrum - is that how you interpreted it? I recorded the conversation so can go back over it and check if needed.
AHQ Price at posting:
11.5¢ Sentiment: Hold Disclosure: Held