Drilling depth targetted 4,000m but may be shallower depending on results.
Spudded in the evening of 31 Jan
Drilling to 9 Feb (= now 9 days of 24 hour drilling?).
Drilled and cased 24in section to 500m
Now drilling 17.5in section to 1184m.
Simple linear extrapolation: 1184/9 = 131.55m per day = around 30 days to full target depth?
From memory PTR started off with low 30's m per day.
Interested to hear your thoughts Juke. While to a non-engineer like myself, a smaller diameter should mean a faster rate, I believe you previously made the comment that the rate normally slows at further depth???
Looks like they're setting a cracking pace to me.
- Forums
- ASX - By Stock
- PAX
- the game's afoot!
the game's afoot!
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PAX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, CEO
Paul Long
CEO
Previous Video
Next Video
SPONSORED BY The Market Online