CCM 5.45% 5.2¢ cadoux limited

Ann: Quarterly Activities/Appendix 5B Cash Flow Report, page-12

  1. 371 Posts.
    lightbulb Created with Sketch. 81
    With regards to the demo plant size
    1. proof of concept is priority
    2. product for off take testing
    3. Used for possible production of 5N once full scale is in operation.

    the physical size of the demo plant will also have an effect on the size of the site needed if it is to be built on the same location as full scale plant. I’m not sure of the volume of product needed to have a successful production of the EGR/FYI tech but the demo size may be factored in for this.

    with the lack of information it’s hard to say where the demo plant output will land.
 
watchlist Created with Sketch. Add CCM (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
-0.003(5.45%)
Mkt cap ! $19.28M
Open High Low Value Volume
5.5¢ 5.5¢ 5.2¢ $1.142K 21.57K

Buyers (Bids)

No. Vol. Price($)
3 369410 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 8000 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
CCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.