in case anyone is thinking about Chalice’s true SP value, I found this interesting formula for calculating the SP (with thanks to Goldilocks from over the Liontown threads). Assuming this guide is reliable and using the NPV of the Gonneville deposit (currentl conservative estimate $50 billion? ) and scoping study due to be released anytime now - then you can work out what the SP should be?
As a general rule of thumb for (FAIR VALUE) S/P as a function of NPV used by many is as follows.
1) SS/PFS performed, no offtakes, no finance = 10-20% of NPV
2) DFS/BFS pilot plant no offtakes no finance = 15-30% of NPV
3) Either of the above with offtakes secured = 25-40%
4) Any of the above with finance secured = 35-50%
5) in construction near term production = 50-75%
CHN chart, page-3587
-
- There are more pages in this discussion • 5,609 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.55 |
Change
-0.050(3.13%) |
Mkt cap ! $601.0M |
Open | High | Low | Value | Volume |
$1.56 | $1.59 | $1.50 | $3.657M | 2.364M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1298 | $1.54 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.55 | 9737 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1298 | 1.540 |
2 | 17076 | 1.525 |
1 | 20000 | 1.515 |
2 | 25100 | 1.510 |
10 | 54288 | 1.500 |
Price($) | Vol. | No. |
---|---|---|
1.545 | 9737 | 1 |
1.550 | 17142 | 3 |
1.580 | 5000 | 1 |
1.590 | 15000 | 2 |
1.595 | 18328 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CHN (ASX) Chart |