    in case anyone is thinking about Chalice’s true SP value, I found this interesting formula for calculating the SP (with thanks to Goldilocks from over the Liontown threads). Assuming this guide is reliable and using the NPV of the Gonneville deposit (currentl conservative estimate $50 billion? ) and scoping study due to be released anytime now - then you can work out what the SP should be?

    As a general rule of thumb for (FAIR VALUE) S/P as a function of NPV used by many is as follows.

    1) SS/PFS performed, no offtakes, no finance = 10-20% of NPV

    2) DFS/BFS pilot plant no offtakes no finance = 15-30% of NPV

    3) Either of the above with offtakes secured = 25-40%

    4) Any of the above with finance secured = 35-50%

    5) in construction near term production = 50-75%

 