Jukes I have been thinking the same I thought I'd merge these thoughts and email Terry Kallis given me brother is a shareholder. Below is the email I sent which I could have maybe toned down a little in hindsight and his reply.
Hi Terry,
Quick question that has been bothering me and I'm sure many over investors over the past few days. In the Paralana update dated 14/12/2009 it was stated that temperature measurements would be taken in about 4 to 5 weeks. Regardless of the heavy rain (which did not occur the whole month of January) why were the temperature measurements instead scheduled for Feb 6th and 7th? If this was the case would it not have been better to notify shareholders of the rescheduling. I think many lost confidence and the fall in the share price is creating a vicious cycle as capital raising will no doubt need to occur in the near future given the latest cost overrun.
Allowing for more time to achieve equilibrium suggests lack of confidence in the temperature when instead a few measurements could have been taken over the past month to mathematically estimate the temperature increase over time.
I thank you in advance for your time,
Arthur
REPLY-
Arthur,
I note your comments and will not comment on your interpretations
Other than to say availability of logging equipment (and ability to transport it - rain) determines when we can do things and unfortunately this no always in our control
Petratherm has sought to measure the temperature (and many other logs) as soon as practicable after casing and cementing.
Terry Kallis
Petratherm Limited
Unfortunately not too happy with the reply. If equipment and transport was not available in January then the market should have been notified then that PTR intended to reschedule it to a later date.
- Forums
- ASX - By Stock
- BPT
- Ann: Paralana Joint Venture Project Update
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.31 |
Change
0.025(1.95%) |
Mkt cap ! $2.977B |
Open | High | Low | Value | Volume |
$1.30 | $1.31 | $1.29 | $12.66M | 9.749M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 6390 | $1.30 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.31 | 211309 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 6390 | 1.300 |
4 | 39961 | 1.295 |
11 | 176936 | 1.290 |
11 | 171386 | 1.285 |
10 | 143558 | 1.280 |
Price($) | Vol. | No. |
---|---|---|
1.305 | 211309 | 8 |
1.310 | 314066 | 12 |
1.315 | 422894 | 9 |
1.320 | 251551 | 11 |
1.325 | 510136 | 10 |
Last trade - 16.10pm 27/08/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online