Thanks Sentia/Warren
A quick question just to see what your thoughts are:
I was wondering with the initial flow rates (i.e. 1.8m cf gas and 56 bbo/day) using a 6/64 "choke". If these were the "final" results, would that be considered commercial?
My understanding is that once flow rates are consistent and considered ok for production, we then wait for the estimate of structural size (which would take longer).