CBE 0.00% 7.0¢ cobre limited

What’s CBE Worth, page-526

  1. 590 Posts.
    lightbulb Created with Sketch. 702
    LST/Wiseoldowl

    From what Martin has said, and the CBE announcements, the most logical conclusion is that the result for NCP11 (the 70m step-back) is not overdue.

    There have been 5 relevant announcements:

    1. 6 Jul - drilling started
    2. 27 Jul - NCP07 (381m) result
    3. 1 Aug - NCP08 (171m) result
    4. 3 Aug - NCP09 (246m but still drilling on 3 Aug) result
    5. 16 Aug - NCP 10 (352m) result, NCP11 in progress.

    So, 1150m over 42 days, and allowing 2 days to write the report, implies 29m/day average drilling rate (which is not a fast rate, perhaps because of the sand cover?).

    With a 70m step-back and the same 60 degree azimuth, NCP11 has probably been designed to be greater than 300m, say 10 days if they maintain the average.

    Allowing 2 days for the report, you can conclude it is not overdue and could fall anytime from now in the next few days.
 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
(20min delay)
Last
7.0¢
Change
0.000(0.00%)
Mkt cap ! $23.17M
Open High Low Value Volume
7.1¢ 7.3¢ 7.0¢ $15.07K 210.8K

Buyers (Bids)

No. Vol. Price($)
2 98305 7.0¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 54215 1
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
CBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.