Building collapse, page-95

  1. 257 Posts.
    lightbulb Created with Sketch. 115
    The main reason the building industry is more exposed, is the very long lead time from estimating the project (which is usually months before contract signing) through to actually purchasing the materials, sometime a year or two later. Most other industries are not exposed to this long of a transaction time frame.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.