SHP 10.0% 0.9¢ south harz potash ltd

[VID] SOUTH HARZ POTASH TIPPED TO SOLVE THE GLOBAL SUPPLY CHAIN SHORTAGES, page-7

  1. 2,572 Posts.
    lightbulb Created with Sketch. 1131
    Incorrect. Jansen shafts under construction for the rest of this calendar year, and they cover a specific area across 200km of tenement

    https://hotcopper.com.au/data/attachments/4655/4655738-b9f72fe8849dbd342a3844fe79b9b490.jpg


    Also, their shafts need to hit a resource 1 km deep instead of 600m. The relationship between depth and cost is non linear, as the energy and equipment required to ventilate etc is much greater at that depth

    Also, they've been building shafts for their tier 1 scale. Our feasibility study is targeting project O scale, although there is the potential to leverage same shafts, and we also have historic shafts that might allow some leverage
    Last edited by HeliosUK: 06/09/22
 
watchlist Created with Sketch. Add SHP (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $8.497M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $576 64K

Buyers (Bids)

No. Vol. Price($)
5 2200718 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 613249 5
View Market Depth
Last trade - 11.57am 01/10/2024 (20 minute delay) ?
SHP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.