The original DFS covered the entire project area as well as the EIA. A second DFS would be more about the design and operation of a commercially viable Direct Extraction plant which is a completely different animal to the stage 1 project. No doubt these funds will be used to accelerate the stage 2 process.
- Forums
- ASX - By Stock
- LPI
- Ann: Trading Halt
Ann: Trading Halt, page-83
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)