Traxys will get a commission of the LCE sold, not ore. That 20% is of the ore cost, and being reasonably low-grade mica wouldn't be overly pricey.
Even after those profit shares they're still aiming to be one of the lowest cost producers so shouldn't be an issue.
I believe LPD were targeting use of an EV fleet for the mine, given the small size of mine and fleet required. The green hydrogen was for use on the boilers in the P1P.
- Forums
- ASX - By Stock
- LPD
- Ann: Helikon 4 shaping up to materially extend Phase 1 life
Ann: Helikon 4 shaping up to materially extend Phase 1 life, page-68
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $17.17M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
176 | 202034476 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 108832658 | 59 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
168 | 193984351 | 0.002 |
43 | 173561088 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 65699862 | 54 |
0.004 | 38086890 | 38 |
0.005 | 11336744 | 12 |
0.006 | 9227565 | 15 |
0.007 | 4963896 | 6 |
Last trade - 16.12pm 12/07/2024 (20 minute delay) ? |
Featured News
LPD (ASX) Chart |
Day chart unavailable