I'm no expert and I'm sure someone with experience in this field can chime in but why install the gear and just have it sitting idle with risk of damage or other problems that may occur. I doubt the interconnection of all the equipment will take long. The last thing we need is a delay due to damaged equipment/materials.
The program itself states fluid pumping will occur within a month of installation, in the grand scheme of things that's not long at all.
- Forums
- ASX - By Stock
- EXR
- Ann: CBM Pilot Project Update
Ann: CBM Pilot Project Update, page-29
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.003(5.36%) |
Mkt cap ! $67.02M |
Open | High | Low | Value | Volume |
5.8¢ | 5.9¢ | 5.8¢ | $18.95K | 325.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 142441 | 5.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.9¢ | 186828 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 142441 | 0.058 |
1 | 17543 | 0.057 |
5 | 393529 | 0.056 |
9 | 207094 | 0.055 |
3 | 128535 | 0.054 |
Price($) | Vol. | No. |
---|---|---|
0.059 | 186828 | 2 |
0.060 | 167060 | 1 |
0.061 | 85434 | 2 |
0.062 | 719724 | 5 |
0.063 | 205175 | 2 |
Last trade - 10.13am 06/11/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |