EQR eq resources limited

Ann: 2022 Annual Report, page-2

  1. 1,200 Posts.
    lightbulb Created with Sketch. 264
    For those that don't bother reading the annual report. A few of Kevins key highlights

    1
    We have successfully redefined the Mt Carbine Tungsten Resource resulting in the design of a new open pit that currently allows at least 4-years of open pit mining along with 10 years of Low Grade Stockpile (“LGS”) mining. In this same regard, hole 26 from the Company’s latest drilling sees the ore body extending strongly to the west and at depth. This is very exciting, as we look toward the coming year and planning a drill campaign with the intention of converting additional resource in the Western Extension into Reserves and to better understand the extent of the ore body through the Western Extension as it appears to have the potential to extend the open pit life of mine. Lastly, in regard to the mining, EQR was able to complete a Scoping Study on the Underground Resource at Mt Carbine which gives the team additional confidence to drill out and convert the study to pre-feasibility in the near future.

    2.
    The completion of the BFS has shown the strong fundamentals of the Mt Carbine Tungsten Project and set the foundation for further resource definition, expansion, and positive project economics. In the coming months, the Company is targeting the republication of an updated BFS showing the economics of the new Open Pit from the recent Reserve Upgrade.

    3. Since the completion of the BFS, we have been able to upgrade, acquire and install several key pieces of equipment at the Mt Carbine operations that have proven their positive economic impact. The exact upgrades are discussed in detail within the Mt Carbine Expansion section of the Report, however, the past year has seen a second XRT Sorter purchased and commissioned, the crushing and screening capacity increased through the Early Works capital expansion, along with the upgrade of the overhead power lines. Several of these upgrades were part of the BFS capital requirements and therefore reduce future spend requirements for the execution of the BFS.

    4.
    EQR has had strong support from the Government getting behind their Critical Minerals Strategy for Australia. This has been shown through the Company receiving Federal Grants from Advanced Manufacturing Growth Centre (“AMGC”), accelerating the purchase of a second XRT Sorter and the Critical Minerals Accelerator Initiative, which is a grant for $6M focused on the execution of the BFS capital expansion. These grants greatly benefit the development of the Mt Carbine Tungsten Project as it is non-dilutive to long-term shareholders.


    page 15
    "The Company now has 1 million ton per annum (Mtpa) processing capacity and is set to achieve a forecast 90 tonnes (“t”) of concentrate produced per month at current rates. The next production step change will come from the processing of significantly higher feed grade material from the open pit operation set to kick-off in 2023"



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.4¢
Change
-0.001(2.86%)
Mkt cap ! $91.02M
Open High Low Value Volume
3.6¢ 3.6¢ 3.2¢ $66.52K 1.995M

Buyers (Bids)

No. Vol. Price($)
1 100000 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 248770 1
View Market Depth
Last trade - 16.10pm 23/06/2025 (20 minute delay) ?
EQR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.