Weekly Drilling Update on J-50 Exploration Well (SV Akkar)
The Board of Jupiter Energy Limited (ASX: JPR) is pleased to provide its weekly
update report on the drilling of the J-50 Exploration Well (referred to in previous
announcements as SV Akkar).
J-50 reaches 2470mRT in 216mm hole before drilling ahead to core
the primary Middle Triassic target.
1. Well Name / Permit: J-50, Block 31, Mangistau, Kazakhstan
2. Reporting Period: The period to 1200hrs 25 February 2010
(GMT +5)
3. ASX Release Time and Date: 0700 hrs 26 February 2010
4. Report No: 8
5. Spud Date: 2330hrs, 29 December 2009 (GMT +5)
6. Rig: Astra Star Rig #1 (Turnkey Contract)
7. Days Since Spud: 57.52
8. Location of Well: Latitude: 4346'43.8" N
Longitude: 5150'0.78" E WGS 84
9. Elevation: G.L. 145m MSL
R.T. 150.5m MSL
10. Proposed Depth: 3200 - 3300 metres
11. Target(s): Primary Objective: Middle Triassic at
approximately 2920mRT.
Secondary Objective: Nil
12. Present Depth: At 1200hrs 25 February 2010 (GMT +5)
depth was 2470mRT.
13. Current Geological Section
and Hydrocarbon Shows:
Formation: Jurassic sandstones, siltstones
and limestone with some coal.
Hydrocarbon Shows: 2265-2285m, weak
streaming yellow-white cut fluorescence;
2310-2320mRT, weak streaming blue-white
cut fluorescence.
14. Operations since last Report: Drilled ahead in 216mm hole to 2298mRT.
Conducted survey. Pulled out of hole and
changed out drilling jars and inspected bit.
Conducted rig service. Ran in hole. Drilled
ahead in 216mm hole to 2461mRT.
Conducted wiper trip and survey. Pulled
out of hole to 1180mRT and conducted rig
maintenance. Ran in hole and drilled
ahead in 216mm hole.
15. Current Operations: At 1200 hrs 25 February 2010 (GMT +5),
current activity was drilling ahead in
216mm hole at 2470mRT.
16. Future Operations: Continue drilling 216mm hole to
2700mRT. Conduct wiper trip and survey.
Continue drilling ahead to core point.
17. Well/Prospect Description: The J-50 well tests the primary Middle
Triassic objective in a structural horst trap
immediately on trend with the oil
producing North Akkar Field. This location
tests a play with an estimated 20 mmbbl
recoverable mapped within Block 31.
18. Participants in well: Jupiter Energy Limited 100%
Update and planning meetings with the Contractor have continued on an almost
daily basis.
The efficiency of drilling operations improved this week. Overall meterage was
less than planned however, the amount of time spent drilling ahead increased.
Work has continued with the contractor to improve operational efficiency and this
is reflected in the improved surveying and tripping times.
Temperatures in the region have risen this week with maximum temperatures in
Aktau reaching highs above 0⁰C for several days. High winds have impacted rig
operations and made it very difficult to handle drill pipe in the derrick on several
occasions.
For further information please contact:
David Thorpe , Managing Director, Jupiter Energy Limited on +61 (0)8 9322 8222
ENDS
- Forums
- ASX - By Stock
- JPR
- update
update
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
-0.002(6.67%) |
Mkt cap ! $35.68M |
Open | High | Low | Value | Volume |
2.8¢ | 2.8¢ | 2.8¢ | $6.02K | 215K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 141968 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 503699 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 141968 | 0.022 |
1 | 23857 | 0.021 |
1 | 27800 | 0.018 |
1 | 100000 | 0.017 |
2 | 64889 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 503699 | 1 |
0.031 | 200000 | 1 |
0.045 | 22675 | 1 |
0.050 | 170000 | 1 |
0.055 | 35000 | 1 |
Last trade - 14.55pm 08/11/2024 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online