Thanks for sharing that. Btw, I'm a structural engineer with some experience in bridge engineering and monitoring. Let me just say that there are many ways to manage heavy loads on bridges. What you have shared is one possible solution. The best solution (and most expensive) is to permanently strengthen the bridge. But, there are ways of providing temporary strengthening to bridges. If there are multiple river crossings on a haul route, it may be cheaper to design a gantry system that is progressively commissioned at each river crossing to transfer the heavy equipment and then decommissioned and transported to the next river crossing.
- Forums
- ASX - By Stock
- SRL
- Questions for the AGM
Questions for the AGM, page-15
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
40.5¢ |
Change
0.015(3.85%) |
Mkt cap ! $36.54M |
Open | High | Low | Value | Volume |
40.0¢ | 43.5¢ | 38.5¢ | $30.14K | 73.84K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9871 | 38.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
45.0¢ | 5000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9871 | 0.385 |
4 | 10276 | 0.380 |
1 | 8250 | 0.375 |
1 | 5288 | 0.365 |
1 | 22707 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 5000 | 1 |
0.480 | 21250 | 2 |
0.500 | 44460 | 2 |
0.520 | 2964 | 2 |
0.525 | 37000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
SRL (ASX) Chart |