Just as i supected DFS delayed! Thats not a positive for me...
"Definitive Feasibility Study (DFS) Expected in Early 2023 – the Project is aiming to supplylithium concentrate at commercial scale and be economically viable, as per its completed pre- feasibility study (PFS), with the results of DRA Global’s final definitive feasibility study (DFS) expected in Q1 2023."
- Forums
- ASX - By Stock
- EUR
- Ann: Trading Halt
Ann: Trading Halt, page-187
-
- There are more pages in this discussion • 417 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $51.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
EUR (ASX) Chart |
Day chart unavailable